CODACA Full Site
Current location:
Home

>

About CODACA

>

CODACA Milestone
CODACA Milestone

Sep. 2001, CODACA electronics established in Shenzhen.

Dec. 2003, Company moved to Dongfan Industrial Park in Bantian, Shenzhen.

Apr. 2004, Successfully launched SMD power inductor series.

May 2004, Introduced CRM and ERP management system designed by CODACA to solve the basic

                 customer information and production management problem.

Jun. 2004, Successfully launched full series of molded coil products.In the same year, Production capacity

                 meets market share by more than 50%.

Jan. 2005, Registered as Shenzhen CODACA Electronic Co., Ltd.

Mar. 2005, Formally introduced into RoHS regulations.

Mar. 2006, CODACA electronics set up Heyuan SMD power inductor production plant.

Jul. 2006,  ISO9001 quality management system and ISO14001 environmental management system

                 certificated.

Jun. 2007, Suzhou Office established to support customer in east China.

May 2008, Successfully launched DIP type molding power chokes.

Jul. 2008, Successfully launched SMD type molding power chokes.

Jan. 2009, Successfully launched CSB, CSCM, CSCF series high current power inductor.

May 2010, Established magnetic powder core engineering department, developing core material by

                 CODACA to increase competitiveness.

Jun. 2010, Formally introduced into Reach regulations.

Sep. 2010, Heyuan CODACA electronic Co., Ltd established.

Mar. 2012, Shenzhen whole production plant moved to Heyuan; Shenzhen headquarter moved to

                 Shangxue Industrial Park, Bantian, office area was 1500 m2

Agu. 2013, Successfully launched CPD, CSD series high current power inductor for digital amplifier.

Mar. 2015, Successfully launched CSEB series molding powder chokes.

Mar. 2016, Officially set up the industrial level inductor reliability test laboratory.

May 2016, ISO/TS16949 automobile quality management system certificated.

Jul. 2017, Heyuan factory increase one building, total area became 18,000 m2

Sep. 2017, Based on the new magnetic powder core material, many distributed air gap low loss and high

                 current power inductors have been successfully developed and put into production.

Jan. 2018, The registered capital of Shenzhen headquarter increased to CYN 20 million.

Mar 2018, Set up Material Analysis Laboratory, which can be used for surface morphology observation,

                 particle size analysis, element analysis, nondestructive testing, etc.

Jun. 2018, IATF6949 version transfer certification, enhanced the risk management.

Nov. 2018, Successfully launched CSHB series hot-pressing molding powder chokes, increasing the series

                 of current molding power chokes.

Dec. 2018, The ERP system has been upgraded successfully, improved the database of the company's

                 operation and the response speed of company.

Apr. 2019, Established Automotive Level Inductor Reliability Test Laboratory managed under ISO17025

                 standard. CNAS approval project was officially launched.

May 2019, Set up the equipment department, realized the independent design of some non-standard

                 equipment, and help the deployment of future intelligent  factory.

Jul. 2019, Successfully launched different series of common mode inductor.

Oct. 2019, Successfully launched Bonded NdFeB permanent magnet products, and set up 4 standardized

                 production lines.

Nov. 2019, Set up Bonded NdFeB Test Laboratory.

Nov. 2019, Imported Information Security Management System, use the online bank level data encryption

                 to ensure the file data security.

Dec. 2019, “National High Tech Enterprises” affirmed.

Mar. 2020, Heyuan factory increase two more buildings, total area up to 25000m2.

May. 2020, Imported OA system, introduced digital workflow, reduced office cost and improved work

                 efficiency.

Jun. 2020, Upgraded CRM (customer relationship management) system to improve sales management

                 efficiency.

Aug 2020, Successfully launched different series of common mode inductor.

Nov 2020, Test Center approved by CNAS.


电脑访问:午夜电影网-俺去电影网 PC端 | 手机访问:午夜电影网-俺去电影网 手机端
友情链接: